SN.897

From Swindon Panel Reference
Revision as of 15:06, 24 August 2014 by Danny (talk | contribs)
Jump to navigation Jump to search

Back to Control Functions.

This signal was newly installed in connection with the South Marston connection described in GWS.15 and GWS.27.

The signal was then planned to be brought into use on 18 January 2002, as described in GWS.27. (Unlike the rest of the signals involved in the South Marston commissioning, SN.897 was not planned to be installed at the earlier stage in 2000 described in GWS.15.

WON-2002-02.png

and

WON-2002-03.png

The planned work was actually delayed, and the new signal was not commissioned at the time:

WON-2002-04.png