Down Sidings Ground Frame
Jump to navigation
Jump to search
Description
The ground frame worked 346 points, the trailing connection in the Down Goods from the Down Through Siding at Swindon West.
The ground frame was mechanical throughout its life.
Abolition
The ground frame was abolished when the points were removed, after a long period of disuse, from 05.15 on Monday 12 December 2011: