307

From Swindon Panel Reference
Revision as of 15:48, 9 November 2014 by Danny (talk | contribs) (Created page with "Back to Control Functions ==Conversion from Spring to Power operation== The trailing connection in the Down Main from the Down Goods was converted from spring to power o...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions

Conversion from Spring to Power operation

The trailing connection in the Down Main from the Down Goods was converted from spring to power operation shortly before 23 November 1975 and designated 307A. 307 points were re-designated 307B.

1975-06.png