SN.53

From Swindon Panel Reference
Revision as of 13:24, 15 November 2014 by Danny (talk | contribs) (Created page with "Back to Control Functions ==Alterations in connection with Reversible Signalling== From 6 November 1977 the signal was mounted on a right-hand cantilever, in readiness f...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions

Alterations in connection with Reversible Signalling

From 6 November 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.653 on the same structure.

1977-10.png

The reversible signalling was brought into use in 1980 [1].

  1. Signalling Notice 31/2767