UM.75
Jump to navigation
Jump to search
Back to Control Functions.
This signal was planned to be converted to a controlled signal, SN.81, on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.
It was later converted at 0645 on Sunday 11 June 2000.