SN.70
Jump to navigation
Jump to search
Back to Control Functions
[Suspect this it not the same SN.70 as the final SN.70.]
Conversion from automatic
This signal was made controlled and re-designated from DM.89 in December 1970:
AWS Fitment
The signal was fitted with an AWS ramp in October 1971.