This signal was newly installed in connection with the South Marston connection described in GWS.15 and GWS.27.
First Attempt
The signal was planned to be brought into use on 14 February 2000, as described in GWS.15. However, the work was not brought into use due to 'construction difficulties':
Second Attempt
The signal was then planned to be brought into use on 18 February 2002.
and
but wasn't until 4 March 2002....
and even when it was finally brought into use on 4th March 2002, its route towards South Marston Euroterminal was not brought into use.