DM.67
Revision as of 20:41, 5 August 2014 by James Nelhams (talk | contribs)
Origin
DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UF.32 | Down Main | Down Main | DM.68 |
UF.4 | Down Goods Loop |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
SN.10 | Down Main | Down Main | DM.68 |
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...