Articles about Interlockings should aim to include as much of the following as possible:
The top of the page should have a link back to the list of Interlockings.
- Description of the location (miles and chains)
- Description of the track layout controlled
- Type of interlocking
- Method of control
- Date commissioned
- Date controlled onto Swindon Panel (if the interlocking pre-dates the panel)
- Date taken out of use
- (If dates not available, then dates known to be in existence, or not in existence)