SN.278

From Swindon Panel Reference
Revision as of 17:54, 4 December 2014 by Danny (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to Control Functions

Origin

There have been two SN.278s.

The first was a backing signal on the Up Main whose functionality was replaced by SN.662.

It was then reincarnated as the signal protecting the exit from the down siding at Wootton Bassett.

First

The signal existed from the opening of Swindon Panel and was replaced by SN.662 in .

Second

The signal was moved in June 1978, as referred to (incorrectly) in 31/W/2747.

1978-04.png

In 2014, has been surveyed to move the signal 10 yards away from the main line in connection with the installation of axle counters. This work had not taken place at the time of writing (December 2014)