DM.69: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(Border added) |
||
Line 35: | Line 35: | ||
The signal was re-fitted with a 4-aspect head at 04.50 on Monday 28 January 2002, although the top yellow was not brought into use. | The signal was re-fitted with a 4-aspect head at 04.50 on Monday 28 January 2002, although the top yellow was not brought into use. | ||
[[File:WON-2002-02.png]] | [[File:WON-2002-02.png | border]] | ||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 12:04, 24 August 2014
Link back to Control Functions.
Origin
DM.69 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
DM.68 | Down Main | Down Main | DM.70 |
Conversion to Automatic
This signal was planned to be converted to an automatic (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...
Upgrading to 4-aspect
The signal was re-fitted with a 4-aspect head at 04.50 on Monday 28 January 2002, although the top yellow was not brought into use.