DM.69: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
Link back to [[Control Functions]]. | Link back to [[Control Functions]]. | ||
[[File:DM69.jpg|thumb|300px|right|DM69 Showing Double Yellow ''(Photo by Danny Scroggins)'']] | |||
==Origin== | ==Origin== |
Revision as of 20:44, 5 August 2014
Link back to Control Functions.
Origin
DM.69 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
DM.68 | Down Main | Down Main | DM.70 |
Conversion to Automatic
This signal was planned to be converted to an automatic (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...