DM.67: Difference between revisions
Jump to navigation
Jump to search
(Signal numbers table altered) |
m (→Origin) |
||
Line 4: | Line 4: | ||
DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
{| class="wikitable" | {| class="wikitable" |
Revision as of 20:41, 5 August 2014
Origin
DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UF.32 | Down Main | Down Main | DM.68 |
UF.4 | Down Goods Loop |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
SN.10 | Down Main | Down Main | DM.68 |
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...