DM.67: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Added Photo) |
||
Line 1: | Line 1: | ||
[[File:DM67.jpg|thumb|300px|right|DM67 Signal]] | |||
==Origin== | ==Origin== |
Revision as of 20:11, 5 August 2014
Origin
DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UF.32 / UF.4 | Down Main | DOwn Main | DM.68 |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
SN.10 | Down Main | Down Main | DM.68 |
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...