DM.69: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Number of aspects added)
No edit summary
Line 6: Line 6:


Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
{{
Template:LastNextSignals
|LastSignal=[[DM.68]]
|LastSignalLine=Up Main
|NextSignalLine=Up Main
|NextSignal=[[DM.70]]
}}


==Conversion to Automatic==
==Conversion to Automatic==

Revision as of 17:58, 5 August 2014

Link back to Control Functions.

Origin

DM.69 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.

Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.

Previous Signal Line Line Next Signal
DM.68 Up Main Up Main DM.70

Conversion to Automatic

This signal was planned to be converted to an automatic (from what?) on 2 August 1970:

SN Won AKOverton-1.jpg

But the work did not take place as planned:

SN Won AKOverton-2.jpg

and the signal was actually converted to automatic on 6 September of that year.

The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...

  1. Signalling Notice S.2498