UM.73: Difference between revisions
Jump to navigation
Jump to search
(Number of aspects added) |
No edit summary |
||
Line 6: | Line 6: | ||
It had its own repeater, [[UM.73R]] (which eventually became [[UM.75]] under [[Swindon MAS Stage 5]]). | It had its own repeater, [[UM.73R]] (which eventually became [[UM.75]] under [[Swindon MAS Stage 5]]). | ||
{{Template:LastNextSignals | |||
|LastSignal=[[Highworth]]'s Up Starting Signals (Semaphores)<br>[[UM.73R]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[UM.72]] | |||
}} | |||
Supervision of UM.73 passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Supervision of UM.73 passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.75]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[UM.72]] | |||
}} | |||
Revision as of 17:52, 5 August 2014
Link back to Control Functions.
Origin
UM.73 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Highworth Junction SB. It was the first colour light stop signal on teh Up Main in the new set of track circuit block sections that had been installed between Highworth Junction and Uffington SBs.
It had its own repeater, UM.73R (which eventually became UM.75 under Swindon MAS Stage 5).
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
Highworth's Up Starting Signals (Semaphores) UM.73R |
Up Main | Up Main | UM.72 |
Supervision of UM.73 passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.75 | Up Main | Up Main | UM.72 |