UM.68: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Next and last signal added)
No edit summary
Line 11: Line 11:
}}
}}


Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
Supervision passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.


{{Template:LastNextSignals
{{Template:LastNextSignals

Revision as of 17:44, 5 August 2014

Origin

UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.

Previous Signal Line Line Next Signal
UM.69 Up Main UF.22 Up Main

Supervision passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.

Previous Signal Line Line Next Signal
UM.69 Up Main SN.89 Up Main


References

  1. Signalling Notice S.2498