UM.68: Difference between revisions
Jump to navigation
Jump to search
(Next and last signal added) |
No edit summary |
||
| Line 11: | Line 11: | ||
}} | }} | ||
Supervision passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | |||
{{Template:LastNextSignals | {{Template:LastNextSignals | ||
Revision as of 17:44, 5 August 2014
Origin
UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
| Previous Signal | Line | Line | Next Signal |
|---|---|---|---|
| UM.69 | Up Main | UF.22 | Up Main |
Supervision passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
| Previous Signal | Line | Line | Next Signal |
|---|---|---|---|
| UM.69 | Up Main | SN.89 | Up Main |