UM.68: Difference between revisions
Jump to navigation
Jump to search
(Number of aspects added) |
(Next and last signal added) |
||
Line 3: | Line 3: | ||
UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.69]] | |||
|LastSignalLine=Up Main | |||
|NextSignal=Up Main | |||
|NextSignalLine=UF.22 | |||
}} | |||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.69]] | |||
|LastSignalLine=Up Main | |||
|NextSignal=Up Main | |||
|NextSignalLine=[[SN.89]] | |||
}} | |||
Revision as of 17:43, 5 August 2014
Origin
UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.69 | Up Main | UF.22 | Up Main |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.69 | Up Main | SN.89 | Up Main |