UM.68: Difference between revisions
Jump to navigation
Jump to search
(Page created) |
(Number of aspects added) |
||
Line 2: | Line 2: | ||
==Origin== | ==Origin== | ||
UM.68 was | UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. |
Revision as of 17:36, 5 August 2014
Origin
UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.