==Origin==
==Origin==


UM.68 was an automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.
UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.


Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.

Revision as of 17:36, 5 August 2014

Origin

UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.

Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.


References

  1. Signalling Notice S.2498