Christian Malford Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Page created)
 
No edit summary
 
Line 1: Line 1:
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]
This GF was installed under [[Swindon MAS Stage 2|Stage 2 of the Swindon MAS scheme]] on 4th December 1966.
This GF was installed under [[Swindon MAS Stage 2|Stage 2 of the Swindon MAS scheme]] on 4th December 1966.


It controlled a trailing crossover between the main lines and was protected by [[DM.89]] and [[UM.90]] (semi-automatic).
It controlled a trailing crossover between the main lines and was protected by [[DM.89]] and [[UM.90]] (semi-automatic).

Latest revision as of 02:22, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

This GF was installed under Stage 2 of the Swindon MAS scheme on 4th December 1966.

It controlled a trailing crossover between the main lines and was protected by DM.89 and UM.90 (semi-automatic).