Existence

Show on maps in this WON entry relating to the remodelling of Thingley Junction in 1975:

1975-01.png

1975-01-diagram.png

Removal of Crossover

The crossover in the main lines, work from this GF, were removed in April 1975:

1975-03.png

Conversion to 3-lever

The ground frame was converted to three levers, in December 1978:

1978-08.png

Removal of Siding Connection

The siding connection, worked from the GF, was removed in July 1984.

1984-01.png

GPL SN.284 was removed at the same time.

The ground frame having nothing left to control, it is presumed this is the date it was recovered.