Existence
Show on maps in this WON entry relating to the remodelling of Thingley Junction in 1975:
Removal of Crossover
The crossover in the main lines, work from this GF, were removed in April 1975:
Conversion to 3-lever
The ground frame was converted to three levers, in December 1978:
Removal of Siding Connection
The siding connection, worked from the GF, was removed in July 1984.
GPL SN.284 was removed at the same time.
The ground frame having nothing left to control, it is presumed this is the date it was recovered.