Challow Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
Back to list of [[Ground Frames]].
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]


==Recovery==
==Recovery==

Latest revision as of 02:21, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

Recovery

The facing crossover was recovered in November 1975:

1975-05.png

The trailing crossover, and the ground frame itself, were recovered in February 1976:

1976-05.png

An entry in the 'working over' section of the Eastern Region (Southern area) Supplementary Operating Instructions, issued 2 April 1977, instructed its readers to delete the entry for Challow Ground Frame.

ER working over Ashbury 1977.png