The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal [[UM.71]]. | The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal [[UM.71]]. | ||
Latest revision as of 02:20, 7 January 2017
Back to Control Functions | Back to list of Ground Frames
The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal UM.71.
It was installed under Swindon MAS Stage 1 on 12 November 1966[1] and was released by Uffington signal box.
When Uffington SB closed at control over the release passed to Swindon Panel in Swindon MAS Stage 5.