SN.74: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Origin== ... ==Conversion Melksham Line to TCB== Bradford Junction box closed in 1990 and control was transferred to Westbury PSB. No ...")
 
No edit summary
 
Line 1: Line 1:
[[File:SN74.jpg|thumb|450px|right|SN.74. July 2013]]
Back to [[Control Functions]]
Back to [[Control Functions]]



Latest revision as of 00:15, 16 November 2014

SN.74. July 2013

Back to Control Functions

Origin

...

Conversion Melksham Line to TCB

Bradford Junction box closed in 1990 and control was transferred to Westbury PSB.

No signalman token working on the branch was replaced by track circuit block, and the token machines all removed, including the one at SN.74.

1990-01.png