SN.38: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Page created)
 
No edit summary
 
Line 4: Line 4:


It was on the same gantry as [[SN.40]] (DM), [[SN.42]] (UM), [[SN.44]] (DP).
It was on the same gantry as [[SN.40]] (DM), [[SN.42]] (UM), [[SN.44]] (DP).
==Alteration==
The route from the signal to Newburn Sidings (Down Engineers Sidings) was taken out of use in August 1982.
[[File: 1982-01.png|border]]


==Decommissioning==
==Decommissioning==

Latest revision as of 20:01, 15 November 2014

Back to Control Functions.

This signal was at the country end of the Down Goods / Parcels / Relief (at various stages of history), guarding the traps and connection into the Down Main.

It was on the same gantry as SN.40 (DM), SN.42 (UM), SN.44 (DP).

Alteration

The route from the signal to Newburn Sidings (Down Engineers Sidings) was taken out of use in August 1982.

1982-01.png

Decommissioning

The signal was taken out of use in connection with the provision of the new Platform 4 at Swindon, from 0800 on Wednesday 9 October 2002.

WON-2002-05.png