UM.79: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Back to Control Functions ==Origin== ... ==Alterations in connection with Reversible Signalling== From 6 November 1977 the signal was mounted on a new gantry, in readi...") |
No edit summary |
||
Line 12: | Line 12: | ||
The reversible signalling was brought into use in 1980 <ref>Signalling Notice [[31/2767]]</ref>. | The reversible signalling was brought into use in 1980 <ref>Signalling Notice [[31/2767]]</ref>. | ||
==References== | |||
<references/> |
Revision as of 13:25, 15 November 2014
Back to Control Functions
Origin
...
Alterations in connection with Reversible Signalling
From 6 November 1977 the signal was mounted on a new gantry, in readiness for the future installation of SN.653R and DM.79 on the same structure.
The reversible signalling was brought into use in 1980 [1].