SN.10: Difference between revisions
Jump to navigation
Jump to search
Daniel Evans (talk | contribs) (Changes WRT Notice 64) |
No edit summary |
||
Line 171: | Line 171: | ||
| R or Y or G | | R or Y or G | ||
|} | |} | ||
==Alterations in connection with Reversible Signalling== | |||
From 19 June 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of [[SN.610]] on the same structure. | |||
[[File: 1977-06.png|border]] | |||
The reversible signalling was brought into use in 1981 <ref>Signalling Notice [[31/W/2770]]</ref>. | |||
==References== | |||
All data from [[Sources - Locking_Sketches|BR(W) Uffington Locking Sketch, S277/2, Drawn Feb 76, Checked July 76. (9465)]] unless otherwise noted. | All data from [[Sources - Locking_Sketches|BR(W) Uffington Locking Sketch, S277/2, Drawn Feb 76, Checked July 76. (9465)]] unless otherwise noted. | ||
<references /> | <references /> |
Revision as of 13:01, 15 November 2014
Link back to Control Functions.
Signal Details
Form of Signal: | Colour Light |
---|---|
Type of Signal: | Main Aspect |
Number of Aspects: | 3, 4 after 13 Sep 1993[1] |
Line: | Down Main |
Working: | Controlled |
Interlocking: | Uffington |
Mileage: | 66m 16ch |
Mounting: | Gantry with SN.610 |
Date into use: | 30 May 1965[2] |
Date onto Swindon Panel: | 3 Mar 1968[3] |
Date out of use: | In use |
Former names: | UF.32 |
Routes
ID | Destination | Next Signal | JI | SI | Remarks |
---|---|---|---|---|---|
A | Down Goods | SN.12 | 1 | - | P/NP. Removed some time after 13 Sep 1993[1] |
B | Down Main | DM.67 | - | - | Auto Switch |
C | Up Main (Reversible) | SN.620R/SN.620 | 4 | - | Added 5 Nov 1978. Brought into use 2nd Feb 1981 [4] |
Aspect Sequence
Before 13 Sep 1993
Route | SN.10 | SN.12 | DM.67 | DM.68 | SN.620R | SN.620 |
---|---|---|---|---|---|---|
A | R>Y | R | - | - | - | - |
B | G | - | Y | R | - | - |
B | Y | - | R | - | - | - |
B | R | - | - | - | - | - |
C | R>G | - | - | - | Y or G | R or Y or G |
After 13 Sep 1993
Route | SN.10 | SN.12 | DM.67 | DM.68 | DM.69 | SN.620R | SN.620 |
---|---|---|---|---|---|---|---|
A | R>Y | R | - | - | - | - | - |
B | G | - | YY | Y | R | - | - |
B | YY | - | Y | R | - | - | - |
B | Y | - | R | - | - | - | - |
B | R | - | - | - | - | - | - |
C | R>G | - | - | - | - | Y or G | R or Y or G |
Alterations in connection with Reversible Signalling
From 19 June 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.610 on the same structure.
The reversible signalling was brought into use in 1981 [5].
References
All data from BR(W) Uffington Locking Sketch, S277/2, Drawn Feb 76, Checked July 76. (9465) unless otherwise noted.
- ↑ 1.0 1.1 Signalling Notice No. 64
- ↑ Notice LXO.77
- ↑ Notice S.2546
- ↑ Notice 31/W/2769
- ↑ Signalling Notice 31/W/2770