SN.264: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created)
 
mNo edit summary
Line 3: Line 3:
==Removal==
==Removal==


The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an [[UB.LOS|Limit of shunt]], slightly closer to Swindon.
The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an [[UK.LOS|Limit of shunt]], slightly closer to Swindon.


[[File: 1972-01.png | border]]
[[File: 1972-01.png | border]]

Revision as of 14:20, 9 November 2014

Back to Control Functions

Removal

The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an Limit of shunt, slightly closer to Swindon.

1972-01.png