The signal was then planned to be brought into use on 18 February 2002.
The signal was then planned to be brought into use on 18 February 2002.


[[File:WON-2002-02.png | border]]
[[File:WON-2002-06.png | border]]


and
and

Latest revision as of 16:45, 24 August 2014

Back to Control Functions.

This signal was newly installed in connection with the South Marston connection described in GWS.15 and GWS.27.

First Attempt

The signal was planned to be brought into use on 14 February 2000, as described in GWS.15. However, the work was not brought into use due to 'construction difficulties':

WON-2000-03.png

Second Attempt

The signal was then planned to be brought into use on 18 February 2002.

WON-2002-06.png

and

WON-2002-03.png

but wasn't until 4 March 2002....