SN.604: Difference between revisions
Jump to navigation
Jump to search
(Page created) |
mNo edit summary |
||
Line 3: | Line 3: | ||
This signal was newly installed in connection with the [[South Marston]] connection described in [[GWS.15]] and [[GWS.27]]. | This signal was newly installed in connection with the [[South Marston]] connection described in [[GWS.15]] and [[GWS.27]]. | ||
The signal was planned to be brought into use on | ==First Attempt== | ||
The signal was planned to be brought into use on 14 February 2000, as described in [[GWS.15]]. However, the work was not brought into use due to 'construction difficulties': | |||
[[File:WON-2000-03.png | border]] | |||
==Second Attempt== | |||
The signal was then planned to be brought into use on 18 February 2002. | |||
[[File:WON-2002-02.png | border]] | [[File:WON-2002-02.png | border]] | ||
Line 11: | Line 19: | ||
[[File:WON-2002-03.png | border]] | [[File:WON-2002-03.png | border]] | ||
but wasn't.... | but wasn't until 18 February 2002.... | ||
[[File:WON-2002-04.png | border]] | [[File:WON-2002-04.png | border]] | ||
and even when it was finally brought into use on 4th March 2002, its route towards [[South Marston]] Euroterminal was not brought into use. | and even when it was finally brought into use on 4th March 2002, its route towards [[South Marston]] Euroterminal was not brought into use. |
Revision as of 12:46, 24 August 2014
Back to Control Functions.
This signal was newly installed in connection with the South Marston connection described in GWS.15 and GWS.27.
First Attempt
The signal was planned to be brought into use on 14 February 2000, as described in GWS.15. However, the work was not brought into use due to 'construction difficulties':
Second Attempt
The signal was then planned to be brought into use on 18 February 2002.
and
but wasn't until 18 February 2002....
and even when it was finally brought into use on 4th March 2002, its route towards South Marston Euroterminal was not brought into use.