DM.67: Difference between revisions
Jump to navigation
Jump to search
(Added Photo) |
(Signal numbers table altered) |
||
Line 5: | Line 5: | ||
DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
{ | |||
| | {| class="wikitable" | ||
| | !Previous Signal | ||
| | !Line | ||
| | !Line | ||
!Next Signal | |||
|- | |||
|UF.32 | |||
|Down Main | |||
|rowspan="2" | Down Main | |||
|rowspan="2" | [[DM.68]] | |||
|- | |||
|UF.4 | |||
|Down Goods Loop | |||
|} | |||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. |
Revision as of 20:37, 5 August 2014
Origin
DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UF.32 | Down Main | Down Main | DM.68 |
UF.4 | Down Goods Loop |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
SN.10 | Down Main | Down Main | DM.68 |
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...