UM.68: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Number of aspects added)
(Next and last signal added)
Line 3: Line 3:


UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.
UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.
{{Template:LastNextSignals
|LastSignal=[[UM.69]]
|LastSignalLine=Up Main
|NextSignal=Up Main
|NextSignalLine=UF.22
}}


Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968.
{{Template:LastNextSignals
|LastSignal=[[UM.69]]
|LastSignalLine=Up Main
|NextSignal=Up Main
|NextSignalLine=[[SN.89]]
}}





Revision as of 17:43, 5 August 2014

Origin

UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.

Previous Signal Line Line Next Signal
UM.69 Up Main UF.22 Up Main

Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.

Previous Signal Line Line Next Signal
UM.69 Up Main SN.89 Up Main


References

  1. Signalling Notice S.2498