DM.67: Difference between revisions
Jump to navigation
Jump to search
m (Number of aspects added) |
No edit summary |
||
Line 3: | Line 3: | ||
DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
{{ | |||
Template:LastNextSignals | |||
|LastSignal=UF.32 / UF.4 | |||
|LastSignalLine=Down Main | |||
|NextSignalLine=DOwn Main | |||
|NextSignal=[[DM.68]] | |||
}} | |||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | ||
{{ | |||
Template:LastNextSignals | |||
|LastSignal=[[SN.10]] | |||
|LastSignalLine=Down Main | |||
|NextSignalLine=Down Main | |||
|NextSignal=[[DM.68]] | |||
}} | |||
==Conversion to Automatic== | ==Conversion to Automatic== |
Revision as of 18:00, 5 August 2014
Origin
DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UF.32 / UF.4 | Down Main | DOwn Main | DM.68 |
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
SN.10 | Down Main | Down Main | DM.68 |
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...