Ashbury: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Addition of signal box information) |
||
Line 1: | Line 1: | ||
==Signal Box== | |||
The mechanical signal box at Ashbury was taken out of use under [[Swindon MAS Stage 1]], 12 November 1966<ref>[[S.2498]]</ref>. | |||
==Level Crossing== | |||
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref>[[S.2498]]</ref>. | The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref>[[S.2498]]</ref>. |
Revision as of 16:40, 5 August 2014
Signal Box
The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].
Level Crossing
The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[2].
The crossing was closed with the raising of the line speed at the time of the introduction of HST.