DM.67: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(Origins added) |
||
Line 1: | Line 1: | ||
==Origin== | |||
DM.67 was an automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | |||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | |||
==Conversion to Automatic== | |||
This signal was converted to an automatic (from what?) on 2 August 1970: | This signal was converted to an automatic (from what?) on 2 August 1970: | ||
Line 4: | Line 13: | ||
The signal is shown as already an automatic in the resignalling notice [[S.2489]], so unknown what it was converted to an automatic from... | The signal is shown as already an automatic in the resignalling notice [[S.2489]], so unknown what it was converted to an automatic from... | ||
==References== | |||
<references/> |
Revision as of 17:12, 5 August 2014
Origin
DM.67 was an automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Conversion to Automatic
This signal was converted to an automatic (from what?) on 2 August 1970:
The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...