DM.70 was the protecting signal for Ashbury Level Crossing on the Down Main.
DM.70 was the protecting signal for Ashbury Level Crossing and Ground Frame on the Down Main.


This signal was planned to be converted to a controlled signal ([[SN.18]]) (from a semi-automatic) on 2 August 1970:
This signal was planned to be converted to a controlled signal ([[SN.18]]) (from a semi-automatic) on 2 August 1970:

Revision as of 16:27, 5 August 2014

DM.70 was the protecting signal for Ashbury Level Crossing and Ground Frame on the Down Main.

This signal was planned to be converted to a controlled signal (SN.18) (from a semi-automatic) on 2 August 1970:

SN Won AKOverton-1.jpg

But the work did not take place as planned:

SN Won AKOverton-2.jpg

and the signal was actually converted to SN.18 on 6 September of that year.

Latterly the signal was converted back to an automatic.