Knighton: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Page created)
 
(Signal Box Information Added)
Line 1: Line 1:
Site of a former level crossing, converted to AHB at the time of Swindon MAS, and closed with the raising of the line speed at the time of the introduction of HST.
==Signal Box==
 
The mechanical signal box at Knighton was taken out of use preliminary to [[Swindon MAS Stage 1]], between 0700 and 0800 on Saturday 12 November 1966<ref name="S.2498">[[S.2498]]</ref>.
 
==Level Crossing==
 
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref name="S.2498" />.
 
The crossing was closed with the raising of the line speed at the time of the introduction of HST.
 
<references />

Revision as of 16:41, 5 August 2014

Signal Box

The mechanical signal box at Knighton was taken out of use preliminary to Swindon MAS Stage 1, between 0700 and 0800 on Saturday 12 November 1966[1].

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].

The crossing was closed with the raising of the line speed at the time of the introduction of HST.

  1. 1.0 1.1 S.2498