DM.74: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 21: Line 21:
==Movement==
==Movement==


The signal was moved forward 180 yards in July 1983.
The signal was moved forward 180 yards in July 1983 [for what reason?].


[[File: 1983-01.png|border]]
[[File: 1983-01.png|border]]

Latest revision as of 20:06, 15 November 2014

Back to Control Functions.


Origin

...


Alterations in connection with Reversible Signalling

From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.624RR.

1977-03.png

The reversible signalling was brought into use in 1981 [1].

Bridge Works

During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal.

Movement

The signal was moved forward 180 yards in July 1983 [for what reason?].

1983-01.png


Removal

This signal was planned to be removed on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.

WON-2000-03.png

It was later planned to be removed on 11 February 2002, as described in GWS.27:

WON-2002-06.png

and

WON-2002-03.png

but wasn't until 18 February 2002....

WON-2002-04.png

  1. Signalling Notice 31/2766