Chippenham East Ground Frame: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 9: | Line 9: | ||
[[File: 1975-01-diagram.png | border | 1000px]] | [[File: 1975-01-diagram.png | border | 1000px]] | ||
==Removal== | ==Removal of Crossover== | ||
The crossover in the main lines, work from this GF, were removed in April 1975: | The crossover in the main lines, work from this GF, were removed in April 1975: | ||
Line 15: | Line 15: | ||
[[File: 1975-03.png | border]] | [[File: 1975-03.png | border]] | ||
== | ==Conversion to 3-lever== | ||
The ground frame was | The ground frame was converted to three levers, in December 1978: | ||
[[File: 1978-08.png | border]] | [[File: 1978-08.png | border]] | ||
==Removal of Siding Connection== | |||
The siding connection, worked from the GF, was removed in July 1984. | |||
[[File: 1984-01.png]] | |||
GPL [[SN.284]] was removed at the same time. | |||
The ground frame having nothing level to control, it is presumed this is the date it was recovered. |
Revision as of 15:20, 15 November 2014
Back to list of Ground Frames
Existence
Show on maps in this WON entry relating to the remodelling of Thingley Junction in 1975:
Removal of Crossover
The crossover in the main lines, work from this GF, were removed in April 1975:
Conversion to 3-lever
The ground frame was converted to three levers, in December 1978:
Removal of Siding Connection
The siding connection, worked from the GF, was removed in July 1984.
GPL SN.284 was removed at the same time.
The ground frame having nothing level to control, it is presumed this is the date it was recovered.