SN.24: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
[[File: 1976-06.png | border]] | [[File: 1976-06.png | border]] | ||
==Alterations to Profile== | |||
In May 1976 the signal was fitted with a number 1 junction indicator for routes towards the (new) Down Goods. The stencil box that formerly gave this information was removed. | |||
[[File: 1976-08.png | border]] |
Revision as of 16:40, 9 November 2014
Back to Control Functions
Movement onto gantry
The signal was moved onto a gantry (in preparation for the installation of SN.624) in March 1976:
Alterations to Profile
In May 1976 the signal was fitted with a number 1 junction indicator for routes towards the (new) Down Goods. The stencil box that formerly gave this information was removed.