DM.74: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:


...
...
==Alterations in connection with Reversible Signalling==
From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of [[SN.624RR]].
[[File: 1977-03.png|border]]
The reversible signalling was brought into use in 1981 <ref>Signalling Notice [[31/2766]]</ref>.


==Bridge Works==
==Bridge Works==

Revision as of 12:51, 15 November 2014

Back to Control Functions.


Origin

...


Alterations in connection with Reversible Signalling

From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.624RR.

1977-03.png

The reversible signalling was brought into use in 1981 [1].

Bridge Works

During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal.

Removal

This signal was planned to be removed on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.

WON-2000-03.png

It was later planned to be removed on 11 February 2002, as described in GWS.27:

WON-2002-06.png

and

WON-2002-03.png

but wasn't until 18 February 2002....

WON-2002-04.png

  1. Signalling Notice 31/2766