307: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Back to Control Functions ==Conversion from Spring to Power operation== The trailing connection in the Down Main from the Down Goods was converted from spring to power o...") |
No edit summary |
||
Line 6: | Line 6: | ||
[[File: 1975-06.png | border]] | [[File: 1975-06.png | border]] | ||
==Removal== | |||
The points were shown as being removed in September 1994, having been out of use since an unknown date before: | |||
[[File: 1996-01.png | border]] |
Revision as of 23:07, 15 November 2014
Back to Control Functions
Conversion from Spring to Power operation
The trailing connection in the Down Main from the Down Goods was converted from spring to power operation shortly before 23 November 1975 and designated 307A. 307 points were re-designated 307B.
Removal
The points were shown as being removed in September 1994, having been out of use since an unknown date before: