SN.70: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created)
 
(AWS added)
Line 6: Line 6:


[[File:1970-04.png | border]]
[[File:1970-04.png | border]]
==AWS Fitment==
The signal was fitted with an AWS ramp in October 1971.
[[File: 1971-01.png | border]]

Revision as of 12:40, 9 November 2014

Back to Control Functions

Conversion from automatic

This signal was made controlled and re-designated from DM.89 in December 1970:

1970-04.png

AWS Fitment

The signal was fitted with an AWS ramp in October 1971.

1971-01.png