DM.69: Difference between revisions
No edit summary |
mNo edit summary |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
Link back to [[Control Functions]]. | Link back to [[Control Functions]]. | ||
[[File:DM69.jpg|thumb|300px|right|DM69 Showing Double Yellow ''(Photo by Danny Scroggins)'']] | |||
==Origin== | ==Origin== | ||
Line 10: | Line 12: | ||
Template:LastNextSignals | Template:LastNextSignals | ||
|LastSignal=[[DM.68]] | |LastSignal=[[DM.68]] | ||
|LastSignalLine= | |LastSignalLine=Down Main | ||
|NextSignalLine= | |NextSignalLine=Down Main | ||
|NextSignal=[[DM.70]] | |NextSignal=[[DM.70]] | ||
}} | }} | ||
Line 28: | Line 30: | ||
The signal is shown as already an automatic in the resignalling notice [[S.2489]], so unknown what it was converted to an automatic from... | The signal is shown as already an automatic in the resignalling notice [[S.2489]], so unknown what it was converted to an automatic from... | ||
==Upgrading to 4-aspect== | |||
The signal was re-fitted with a 4-aspect head at 04.50 on Monday 28 January 2002, although the top yellow was not brought into use. | |||
[[File:WON-2002-02.png | border]] | |||
---- | |||
The top yellow aspect was planned to be brought into use on 7 February 2000, as described in [[GWS.15]], but, due to 'construction difficulties' the work did not take place. | |||
[[File:WON-2000-03.png | border]] | |||
The top yellow was then planned to be brought into use on 11 February 2002, as described in [[GWS.27]]. | |||
[[File:WON-2002-06.png | border]] | |||
and | |||
[[File:WON-2002-03.png | border]] | |||
but wasn't until 18 February 2002.... | |||
[[File:WON-2002-04.png | border]] | |||
==References== | |||
<references/> |
Latest revision as of 16:40, 24 August 2014
Link back to Control Functions.
Origin
DM.69 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
DM.68 | Down Main | Down Main | DM.70 |
Conversion to Automatic
This signal was planned to be converted to an automatic (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...
Upgrading to 4-aspect
The signal was re-fitted with a 4-aspect head at 04.50 on Monday 28 January 2002, although the top yellow was not brought into use.
The top yellow aspect was planned to be brought into use on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.
The top yellow was then planned to be brought into use on 11 February 2002, as described in GWS.27.
and
but wasn't until 18 February 2002....