Chippenham East Ground Frame: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to list of | Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]] | ||
==Existence== | ==Existence== | ||
Line 9: | Line 9: | ||
[[File: 1975-01-diagram.png | border | 1000px]] | [[File: 1975-01-diagram.png | border | 1000px]] | ||
==Removal== | ==Removal of Crossover== | ||
The | The crossover in the main lines, work from this GF, were removed in April 1975: | ||
[[File: 1975-03.png | border]] | [[File: 1975-03.png | border]] | ||
==Conversion to 3-lever== | |||
The ground frame was converted to three levers, in December 1978: | |||
[[File: 1978-08.png | border]] | |||
==Removal of Siding Connection== | |||
The siding connection, worked from the GF, was removed in July 1984. | |||
[[File: 1984-01.png|border]] | |||
GPL [[SN.284]] was removed at the same time. | |||
The ground frame having nothing left to control, it is presumed this is the date it was recovered. |
Latest revision as of 02:22, 7 January 2017
Back to Control Functions | Back to list of Ground Frames
Existence
Show on maps in this WON entry relating to the remodelling of Thingley Junction in 1975:
Removal of Crossover
The crossover in the main lines, work from this GF, were removed in April 1975:
Conversion to 3-lever
The ground frame was converted to three levers, in December 1978:
Removal of Siding Connection
The siding connection, worked from the GF, was removed in July 1984.
GPL SN.284 was removed at the same time.
The ground frame having nothing left to control, it is presumed this is the date it was recovered.