DM.80: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 6: Line 6:


[[File: 1974-01.png | border]]
[[File: 1974-01.png | border]]
==Removal==
Over the weekend 3-5 May 1977 the signal was removed as part of the re-spacing of signals between Swindon and Wootton Bassett. SN.50 was moved further from Swindon, as was the next signal [[DM.79]]. DM.80 was removed, leaving one fewer signal section overall.
[[File: 1977-11.png|border]]

Latest revision as of 14:00, 15 November 2014

Back to Control Functions

Conversion from semi-automatic to automatic

The signal was converted from semi-automatic to automatic when Hay Lane Ground Frame was recovered in January 1974.

1974-01.png

Removal

Over the weekend 3-5 May 1977 the signal was removed as part of the re-spacing of signals between Swindon and Wootton Bassett. SN.50 was moved further from Swindon, as was the next signal DM.79. DM.80 was removed, leaving one fewer signal section overall.

1977-11.png