SN.264: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created)
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
==Removal==
==Removal==


The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an [[UB.LOS|Limit of shunt]], slightly closer to Swindon.
The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an [[UK.LOS / UB.LOS (Swindon West)|Limit of shunt]], slightly closer to Swindon.


[[File: 1972-01.png | border]]
[[File: 1972-01.png | border]]

Latest revision as of 22:17, 15 November 2014

Back to Control Functions

Removal

The signal was removed in November 1972 when the connections to the Diesel MPD were recovered. It was replaced by an Limit of shunt, slightly closer to Swindon.

1972-01.png