To Do List: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
* Re-design Membership Prospectus / Society Leaflet | * Re-design Membership Prospectus / Society Leaflet | ||
* Source banner [Tim - on hold while we wait for Charity number] | * Source banner [Tim - on hold while we wait for Charity number] | ||
VISITOR INTERPRETATION | VISITOR INTERPRETATION | ||
Line 45: | Line 41: | ||
PANEL RECREATION | PANEL RECREATION | ||
* Refurbish ground frame cupboard [John M] | * Refurbish ground frame cupboard [John M] | ||
* Engage NR about process for extraction | |||
* Engage scaffolding contractors [Danny] | * Engage scaffolding contractors [Danny] | ||
* Engage jack/skate suppliers [Danny] | * Engage jack/skate suppliers [Danny] | ||
Line 77: | Line 74: | ||
* Drivers' Maps | * Drivers' Maps | ||
* HST Sketch | * HST Sketch | ||
* WONs | |||
(for comparison to SPS locking sketch > simulator) | (for comparison to SPS locking sketch > simulator) | ||
Latest revision as of 23:11, 17 January 2015
Items that are in the conference notes system removed from here
FINANCE
- Identify missing Gift Aid forms [Brian]
PR
- Create 'general' article for magazines etc [Richard]
- Write to Railway Magazine [Robin W]
- Re-design Membership Prospectus / Society Leaflet
- Source banner [Tim - on hold while we wait for Charity number]
VISITOR INTERPRETATION
- Explanation of relay interlocking [Jon T/ Tim M]
- Other explanation boards/exhibits
- Swindon panel visitors guide booklet [Tim M]
- I-Spy booklet for Didcot signalling
WEBSITE
- Move remainder of old news items onto new website.
- Reinstate sign-up-for-details form.
- Add more panel info, ie, track diagram, etc.
WIKI
- Put links on all location pages in the Wiki to the photo pages on the Flickr site.
- Put a photo of each GF/signal/points from the Flickr site on the page for each GF/signal/points in the Wiki.
- Go over scheme plans and add signal details in.
PHOTO SITE
- Finish labelling up Reading Main and Reading Newbury photos. [James N - Newbury Done 07/10/2014, Main Panel now in progress]
- Label up Oxford photos. [James N]
- Upload photos of building [Dave M]
PANEL RECREATION
- Refurbish ground frame cupboard [John M]
- Engage NR about process for extraction
- Engage scaffolding contractors [Danny]
- Engage jack/skate suppliers [Danny]
- Engage lifting contractors [Danny]
- Engage hauliers [Danny]
OPERATIONS BOARD
- Complete Phase 1 Locking Sketch and Domino drawing [Danny]
- Check of locking sketch:
- Signal numbers
- Number of aspects
- DAs / JIs / SIs
- Routes
- Location
- Distances
- Points
- Numbers
- Years of provision
- Within correct TC
- TCs
- Identity
- Correct relative position
- Length
- Signal numbers
Sources:
- Yellow Perils from opening
- Locking Sketches 1970s/80s
- Yellow Perils from Reversible Installation (and others)
- Locking Sketches Today
- Track Diagrams
- Drivers' Maps
- HST Sketch
- WONs
(for comparison to SPS locking sketch > simulator)
- Creation of control tables
- Creation of panel Domino diagram
- Identification of 'fringe' requirements for simulator
- Creation of simulation
- Testing of simulation