To Do List: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Items that are in the conference notes system removed from here''' | |||
FINANCE | FINANCE | ||
* Identify missing Gift Aid forms [Brian] | * Identify missing Gift Aid forms [Brian] | ||
PR | PR | ||
Line 15: | Line 13: | ||
* Re-design Membership Prospectus / Society Leaflet | * Re-design Membership Prospectus / Society Leaflet | ||
* Source banner [Tim - on hold while we wait for Charity number] | * Source banner [Tim - on hold while we wait for Charity number] | ||
VISITOR INTERPRETATION | VISITOR INTERPRETATION | ||
Line 46: | Line 40: | ||
PANEL RECREATION | PANEL RECREATION | ||
* Refurbish ground frame cupboard [John M] | * Refurbish ground frame cupboard [John M] | ||
* Engage NR about process for extraction | |||
* Engage scaffolding contractors [Danny] | * Engage scaffolding contractors [Danny] | ||
* Engage jack/skate suppliers [Danny] | * Engage jack/skate suppliers [Danny] | ||
* Engage lifting contractors [Danny] | * Engage lifting contractors [Danny] | ||
* Engage hauliers [Danny] | * Engage hauliers [Danny] | ||
OPERATIONS BOARD | |||
* Complete Phase 1 Locking Sketch and Domino drawing [Danny] | |||
* Check of locking sketch: | |||
** Signal numbers | |||
*** Number of aspects | |||
*** DAs / JIs / SIs | |||
*** Routes | |||
*** Location | |||
*** Distances | |||
** Points | |||
*** Numbers | |||
*** Years of provision | |||
*** Within correct TC | |||
** TCs | |||
*** Identity | |||
*** Correct relative position | |||
*** Length | |||
Sources: | |||
* Yellow Perils from opening | |||
* Locking Sketches 1970s/80s | |||
* Yellow Perils from Reversible Installation (and others) | |||
* Locking Sketches Today | |||
* Track Diagrams | |||
* Drivers' Maps | |||
* HST Sketch | |||
* WONs | |||
(for comparison to SPS locking sketch > simulator) | |||
* Creation of control tables | |||
* Creation of panel Domino diagram | |||
* Identification of 'fringe' requirements for simulator | |||
* Creation of simulation | |||
* Testing of simulation |
Latest revision as of 23:11, 17 January 2015
Items that are in the conference notes system removed from here
FINANCE
- Identify missing Gift Aid forms [Brian]
PR
- Create 'general' article for magazines etc [Richard]
- Write to Railway Magazine [Robin W]
- Re-design Membership Prospectus / Society Leaflet
- Source banner [Tim - on hold while we wait for Charity number]
VISITOR INTERPRETATION
- Explanation of relay interlocking [Jon T/ Tim M]
- Other explanation boards/exhibits
- Swindon panel visitors guide booklet [Tim M]
- I-Spy booklet for Didcot signalling
WEBSITE
- Move remainder of old news items onto new website.
- Reinstate sign-up-for-details form.
- Add more panel info, ie, track diagram, etc.
WIKI
- Put links on all location pages in the Wiki to the photo pages on the Flickr site.
- Put a photo of each GF/signal/points from the Flickr site on the page for each GF/signal/points in the Wiki.
- Go over scheme plans and add signal details in.
PHOTO SITE
- Finish labelling up Reading Main and Reading Newbury photos. [James N - Newbury Done 07/10/2014, Main Panel now in progress]
- Label up Oxford photos. [James N]
- Upload photos of building [Dave M]
PANEL RECREATION
- Refurbish ground frame cupboard [John M]
- Engage NR about process for extraction
- Engage scaffolding contractors [Danny]
- Engage jack/skate suppliers [Danny]
- Engage lifting contractors [Danny]
- Engage hauliers [Danny]
OPERATIONS BOARD
- Complete Phase 1 Locking Sketch and Domino drawing [Danny]
- Check of locking sketch:
- Signal numbers
- Number of aspects
- DAs / JIs / SIs
- Routes
- Location
- Distances
- Points
- Numbers
- Years of provision
- Within correct TC
- TCs
- Identity
- Correct relative position
- Length
- Signal numbers
Sources:
- Yellow Perils from opening
- Locking Sketches 1970s/80s
- Yellow Perils from Reversible Installation (and others)
- Locking Sketches Today
- Track Diagrams
- Drivers' Maps
- HST Sketch
- WONs
(for comparison to SPS locking sketch > simulator)
- Creation of control tables
- Creation of panel Domino diagram
- Identification of 'fringe' requirements for simulator
- Creation of simulation
- Testing of simulation