SN.620: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
m (Border added)
(Top yellow brought into use added)
Line 4: Line 4:


[[File:WON-2002-01.png | border]]
[[File:WON-2002-01.png | border]]
----
The top yellow aspect was planned to be brought into use on 7 February 2000, as described in [[GWS.15]], but, due to 'construction difficulties' the work did not take place.
[[File:WON-2000-03.png | border]]
The top yellow was then planned to be brought into use on 11 February 2002.
[[File:WON-2002-02.png | border]]
and
[[File:WON-2002-03.png | border]]
but wasn't until 18 February 2002....
[[File:WON-2002-04.png | border]]

Revision as of 12:56, 24 August 2014

Back to Control Functions.

The signal was converted from a three-aspect head to a four-aspect head, and positioned on a new gantry at 04.50 on Monday 14 January 2002. The top yellow was not yet brought into use.

WON-2002-01.png


The top yellow aspect was planned to be brought into use on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.

WON-2000-03.png

The top yellow was then planned to be brought into use on 11 February 2002.

WON-2002-02.png

and

WON-2002-03.png

but wasn't until 18 February 2002....

WON-2002-04.png